Canadian buyer guide

SIASUN DUCO vs. Universal Robots and FANUC CRX: how should Canada compare cobots?

Which workflow should drive your shortlist?

Choose a cobot around the part, tool and required process rather than its brand. The DUCO, UR and CRX examples span different reach and payload combinations. A shortlist for machine tending can differ from one for welding or palletizing because fixtures, safety limits and tool access change the usable envelope.

  • Machine tending starts with the part, gripper, machine door, fixture and collision-free approach. Payload includes tooling; nominal reach does not describe every usable tool orientation.
  • Cobot welding requires a welding process package, fixtures, extraction, shielding and safe access. A welding-labelled arm is not a ready-to-operate welding cell.
  • Palletizing requires a reach and load study across the full stack, including cartons, gripper mass and centre of gravity. Compare cycle time under the validated operating limits, not maximum free-space speed.

How do the published specifications compare?

The named arms illustrate specific payload and reach combinations, not equivalent complete cells. GCR5-910 and UR5e both carry nominal five-kilogram loads but have different reaches; larger examples diverge further. Include tool mass, centre of gravity, controller revision and operating limits before using any published payload to approve an application.

On smaller screens, swipe across the table to compare every model.

Manufacturer reference specifications · checked 24 November 2026
SpecificationDUCO GCR examplesUniversal Robots examplesFANUC CRX examples
Compact handling referenceGCR5-910: 5 kg / 917 mmUR5e: 5 kg / 850 mmCRX-5iA: 5 kg / 994 mm
Medium handling referenceGCR10-1300: 10 kg / 1,300 mmUR10e: 10 or 12.5 kg / 1,300 mm, version dependentCRX-10iA: 10 kg / 1,249 mm
Longer reach referenceGCR16-2000: 16 kg / 2,000 mmUR20: 20 kg / 1,750 mm; 25 kg under specified conditionsCRX-20iA/L: 20 kg / 1,418 mm
Axes6 for the listed GCR arms6 for the listed UR arms6 for the listed CRX arms
Repeatability examplesGCR5-910 ±0.02 mm; GCR16-2000 ±0.05 mmConfirm exact model, revision and test conditionsCRX-5iA ±0.03 mm; CRX-10iA / 20iA/L ±0.04 mm
Protection / environmentGCR5-910 lists IP54 / IP65 configurations; confirm selectionConfirm model and controller ratingsConfirm model and controller ratings
Welding / hazardous-area packageConfirm exact -W or -Ex model and certification scopeConfirm tooling, safeguards and application packageConfirm tooling, safeguards and application package
Canadian cell deliveryCustom-quoted integration, validation and supportCustom-quoted integration, validation and supportCustom-quoted integration, validation and support

Each cell contains a model-specific reference, not a claim that all three models perform the same task. Payload and reach must be checked together with tool mass and centre of gravity.

DUCO appears in searches as SIASUN DUCO. The specifications here refer to the named DUCO GCR products, not a blanket specification or ownership claim for a corporate group.

Sources: DUCO GCR5-910 specifications · DUCO GCR10-1300 specifications · DUCO GCR16-2000 specifications · Universal Robots UR5e technical sheet · Universal Robots UR10e technical specifications · Universal Robots UR20 technical specifications · Universal Robots naming and product FAQ · FANUC CRX 2026 manufacturer brochure · ISO 10218-2:2025 application and cell safety scope

What needs checking at a Canadian site?

Check the proposed equipment and its supporting infrastructure together. Canadian deployment decisions include the actual route or work envelope, electrical acceptance, staff procedures and service responsibility. Treat the following as questions for the facility, supplier and qualified installer; this guide does not certify a product or replace a site assessment.

  • Safety: ask the integrator to document the application risk assessment, safeguards, stopping behaviour and validation. ISO 10218-2:2025 addresses robot applications and cells; discuss applicable collaborative-operation guidance, including ISO/TS 15066, with the responsible specialist.
  • Electrical: identify the acceptance route for the finished control panel, charger if relevant, and ancillary equipment. Request configuration-specific evidence for CSA/cUL or another recognised Canadian approval route, subject to the authority having jurisdiction.
  • Environment: obtain exact temperature, ingress, coolant, dust and washdown limits. IP ratings do not establish explosion protection; hazardous-area work requires separate equipment and site assessment.
  • Support: identify who programs the cell, owns backups, updates safety settings and stocks critical parts. Request service location and response scope in writing without assuming any brand has local coverage for your site.

Health Canada’s electrical product guidance explains recognised Canadian certification marks. Confirm the applicable industrial and provincial requirements for your installation. See Kiza’s verification and deployment approach.

How should purchase, RaaS and pilot costs be compared?

Ask for a CAD proposal covering the complete deployment, then compare arrangements over the same operating period. Equipment price alone omits integration, training and ongoing work. Kiza treats pricing, rental availability and financing terms as custom-quoted items; no published estimate here implies stock, credit approval or a guaranteed service commitment.

  • Purchase: separate equipment, freight, commissioning, software, accessories, training and taxes. Request a maintenance and consumables budget.
  • RaaS: check ownership, minimum term, included support, usage limits, annual changes and early termination. Any conversion-to-purchase option must be written into the proposal.
  • Pilot rental: define duration, installation, acceptance tests, operator responsibilities and collection or return charges. Confirm equipment availability before scheduling.
  • Tax treatment: ask your CPA about CCA eligibility and the treatment of the actual purchase, lease or service contract. Do not base approval on an assumed deduction.

Compare purchase, financing and RaaS · Scope a pilot rental · Review service plans

What should a pilot prove before you commit?

A useful pilot proves an operating result that your team can repeat. Agree the baseline, acceptance criteria and staff responsibilities before equipment arrives. Record interruptions and manual work as carefully as completed tasks, then review the outcome with the people who will operate and maintain the system after handover.

  1. Start with representative parts and the intended tool. Demonstrate pickup, approach, process, unload and exception recovery, not merely a robot moving in free space.
  2. Measure accepted parts per hour with the proposed safety settings and operator interaction. Include fixture changes, reject handling and training.
  3. Agree a handover package containing programs, backups, drawings, maintenance instructions and validation records. Assign ownership of later process changes.

Send your task, facility constraints and preferred timeline through our guided project enquiry. A shortlist is the start of technical verification, not a commitment to a particular model.

Which sources and related guides support this comparison?

Manufacturer pages and manuals provide the reference specifications; Kiza’s workflow recommendations are an editorial assessment of those figures and the procurement questions above. Sources can change by region and revision. Confirm the supplied model in writing, and use the linked application pages to prepare a more specific project brief.

Manufacturer references do not imply an authorised distribution agreement, independent performance testing or guaranteed Canadian availability.

What else do Canadian buyers ask?

These answers address common decisions before a quotation or pilot. They distinguish a published specification from a confirmed site outcome and identify matters that need written supplier confirmation. Use them with the comparison table, rather than as a substitute for the operating trial, configuration review and service agreement for your facility.

Are GCR5-910 and UR5e the same reach class?

They are both useful five-kilogram reference points, but their published reaches differ: DUCO lists 917 mm for GCR5-910 and UR lists 850 mm for UR5e. Check the complete tool envelope, load centre and joint limits in the proposed application.

Does a collaborative arm mean we can remove guarding?

No. Safe operation depends on the application, tools, workpiece, motion and people exposed. A qualified integrator must assess and validate the complete cell. Welding, sharp tools or heavy workpieces can require safeguards even when the arm has collaborative functions.

Why are UR10e payloads and UR model names qualified?

UR documentation includes version-dependent UR10e payload ratings, and naming can change across product generations. Confirm the exact orderable model, controller and manual revision. A familiar search name is not enough to establish the specification of a new quotation.

Is DUCO TÜV certification sufficient for a Canadian installation?

Do not assume so. Obtain the certificate for the exact model and its scope, then separately review the completed application and Canadian electrical acceptance. This guide does not assert that every GCR variant has the same certification, temperature range or hazardous-area rating.

What belongs in a CAD cobot budget besides the arm?

Include tooling, fixtures, guarding or other safeguards, controls, programming, process equipment, electrical work, validation, training and maintenance. Ask a CPA about the tax treatment of the actual arrangement; this comparison makes no accelerated-expensing or tax-savings promise.